Adelaide River Off-Stream Water Storage

T24-1498 Darwin Region – Consultancy – Develop Concept Design for the Adelaide River Off-stream Water Storage (AROWS) Project

Client

SMEC Australia Pty Limited

QS Services Range of Services

QS Services was engaged as a subcontractor to provide Class 3 cost estimate and construction schedule for the conceptual design, basing our Cost Estimate on the guidelines as provided in the document; ‘18R-97: Cost Estimate Classification System – As Applied in Engineering, Procurement, and Construction for the Process Industries [August 7, 2020] | AACE’.Estimate inclusive of River Intake and Pump Station, Floodplain Transfer Mains and Basin Intake structure, Spillway, Outlet works and Delivery Pump Station, Substation, Distribution and Trasmission Lines and pipeline and ancillary infrastructure and access roads.

Provided Materials Schedule of Rates for Dam Construction and a Construction Schedule program